Barcelona–El Prat Airport: from three grass fields to an intercontinental hub. Explore in 3D how it grew from 1916 to 2038, year by year: runways, terminals, aircraft and planned works.
On 15 September 2026 the Council of Ministers approves DORA 2027-2031 (about €13 bn across the network). El Prat gets €1,765 M: T1, T2, airfield, security and €191 M to prepare the expansion and environmental compensation. The runway and satellite terminal are not built in this period: they move to DORA IV (2032-2036). In July the new rail tunnel to T2 and T1 was completed, and Mott MacDonald and IDOM are drafting the new Master Plan.
OpenStreetMap contributors (ODbL), IGN, MDT25 digital terrain model (CC BY 4.0), Institut Cartogràfic i Geològic de Catalunya: ortofotos 1945-2025 (CC BY 4.0), Aena: historia del aeropuerto, Aena: notas de prensa (T1 2009, torre 2007, ILS 2004, Dique Sur 2021, tráfico), BOE: Plan Director 1999, DIA 2002, DORA 2017-2021 y 2027-2031, nombre 2019, BIC mural Miró, Ministerio de Transportes: DORA 2022-2026, Revista de Historia Naval 154 (2021): La Marina y la estación aeronaval de Barcelona, Ajuntament del Prat: El Prat ocult, Enciclopèdia Catalana / Esportpèdia, Docomomo Ibérico: Terminal B y torre de control, Arquitectura Catalana: Terminal 2 y torre de control, The New Barcelona Post: historia del aeropuerto y acuerdo 2025, La Moncloa: DORA III y acceso ferroviario, El Nacional / ON Economia: inversiones de Aena en El Prat, 3Cat: detalles de la ampliación (La Ricarda y El Remolar), Wikidata Q56973 (datos de pasajeros de Aena), Wikimedia Commons (créditos en cada foto)
Chronotopia needs JavaScript and WebGL.
Cargando…