Ibiza Airport: from an earth field by the salt pans to nine million passengers. Explore in 3D how it grew from 1936 to 2036, year by year: runways, terminals, aircraft and planned works.
On 15 September 2026 the government approves DORA III: €229.7 M for Ibiza in 2027-2031, the largest investment in its history. The terminal will grow 60 m to the south-west and gain a non-Schengen pier to the north-east; gates will go from 17 to 32 and jet bridges from 4 to 12. On 20 September thousands march in Vila against the expansion.
OpenStreetMap contributors (ODbL), IGN, MDT25 digital terrain model (CC BY 4.0), IDEIB, Govern de les Illes Balears: ortofotos 1956-2023 (CC BY-SA), IGN / CNIG: PNOA histórico 1997-98 y 2018 (CC BY 4.0 scne.es), Enciclopèdia d’Eivissa i Formentera: aeroport des Codolar, Aena: historia del aeropuerto de Ibiza, Aena: notas de prensa (llegadas 2011, pasarelas 2012, aparcamiento 2020, tráfico 2025), ENAIRE: AIP España, LEIB AD 2, BOE: Planes Directores 2001 y 2010, DIA 2009, informe ambiental 2019, Periódico de Ibiza: historia (2000), obras (2019), récords y ampliación (2025-2026), Noudiari y La Voz de Ibiza: la reforma y el DORA III (2026), Última Hora: DORA III aprobado (2026), Cirer Costa (2010): tráfico aéreo y turismo en Ibiza, Cuadernos de Turismo 26, Wikidata Q1431549 y Wikipedia (datos de pasajeros de Aena), Wikimedia Commons (créditos en cada foto)
Chronotopia needs JavaScript and WebGL.
Cargando…